Skip to content
Africa Thinks Here
Sign InSign Up
Home
Magazines ▾
News ▾
PlatformsStreamingBooks
Digital ▾
Cloud Tools ▾
ClientsCareersContactSubscribeSign InSign Up

Moakanyi Magazine ยท Property

The Wires Between: Why Transmission Earns Its Own Story, Not a Footnote

The Wires Between: Why Transmission Earns Its Own Story, Not a Footnote

Generation makes the news; transmission makes the footnote. Yet a megawatt that cannot reach a load is a megawatt wasted, and China's own white paper figures put as much weight on the wires as on the turbines - some 66,000 km of power transmission and distribution built or upgraded across Africa alongside 120 million kW of generating capacity since 2000, by Beijing's account. The order in which those figures are usually read, plants first and lines a distant second, is exactly backwards for many African systems, where the line, not the plant, is the thing in short supply.

Continue Reading On Moakanyi Magazine

The full story is on Moakanyi Magazine, the Regional Business Magazine for Botswana and Lesotho.

More From Moakanyi Magazine