Hleketa Magazine ยท Economics
Mombasa Port and the inland chain: where corridor efficiency is won or lost

By the headline measure, Mombasa is a success story: cargo dwell time fell from 22 days toward single figures and throughput rose from 13.6 million tonnes in 2016 to around 35 million tonnes by 2023. Yet a container cleared swiftly at the quay can still take seven to ten days to reach Kampala, stopped at checkpoint after checkpoint. The port got faster while the corridor stayed slow - which means the efficiency problem was never really at the port. It was always inland, on roads and borders no crane can fix.
Continue Reading On Hleketa Magazine
The full story is on Hleketa Magazine, the Regional Business Magazine for Mozambique.


